SHARE
COPY LINK
For members

TRAIN TRAVEL

More staff, longer transfer times: How rail travel in Germany is being improved

Germany's state-owned railway operator wants to make life easier for passengers with longer transfer times and a boost in staff numbers.

Stralsund train station
Passengers board a DB train in Stralsund, Mecklenburg Western-Pomerania. Photo: picture alliance/dpa | Stefan Sauer

For most people who have travelled by train this summer, the frustration of delayed and cancelled services and missed connections will be all too familiar. 

Since the pandemic, Deutsche Bahn – Germany’s primary rail operator – has struggled to offer a reliable service to passengers, with just 58 percent of trains departing within five minutes of the scheduled time. To make matters worse, this figure doesn’t take into account the numerous services that have been cancelled outright – a situation that is also happening much more frequently.

READ ALSO: The shocking state of German trains exposes the myth about punctuality

To try and improve the customer experience, DB plans to shake up the way long-distance rail journeys are planned and advertised.

In future, potential delays to services will be factored into the journey plan on the DB Navigator app and internet booking portal. 

In concrete terms, this will mean that customers are given longer times to transfer so that the chance of missing their connection is much less likely. 

For example, if the quickest connection is five or six minutes after the first train is scheduled to arrive, the app may suggest the next train 10 or 15 minutes later to give passengers more of a buffer in the event of delays. 

“We no longer show tight connections that are difficult to achieve in the current operational situation when planning and booking,” said DB board member Michael Peterson.

There won’t be a set transfer time that the company believes is realistic. Instead, current issues and performance statistics on certain stretches of the train line will guide whether an eight or 12 minute transfer seems realistic. 

‘Easier to plan’

Though the quickest connection may not automatically show up on DB’s app or website, customers who end up making an earlier train won’t face any issues with the ticket inspector.

This applies even if the ticket appears to tie the passenger to a specific train service, Peterson said. 

Customers will also be given the flexibility to choose shorter or longer transfer times based on their preferences. Though this may lead to longer journeys, it could help prevent missed connections. 

“We want to make travelling easier to plan,” explained Peterson. “The fastest connection is not always the most reliable.”

READ ALSO: How to find cheap train tickets in Germany

People board an ICE train at Berlin Hauptbahnhof.

People board an ICE train at Berlin Hauptbahnhof. Photo: picture alliance/dpa | Roberto Pfeil

The change to the ticket planning system will also have an impact on the company’s reimbursement policy.

If customers pick a connection that’s shown on the DB Navigator app or website and then miss their second train and face delays to their journey, they’ll still be entitled to compensation. For instance, an hour-long delay would equate to a 25 percent refund of the ticket price. 

However, if the quickest connection isn’t shown on the app but customers decide to risk it anyway, they won’t be entitled to their money back in the event of delays.

According to passenger advocacy group Pro Bahn, the new ‘buffer’ system for transfers should have a positive impact and reflects what many savvy rail travellers have been doing of their own accord.

Pro Bahn also assumes that the new transfer times will run until around 2024, when widespread construction work will begin on the railways.

More staff and seating

Alongside the more generous transfer times, Deutsche Bahn announced on Wednesday that it would be running a staffing offensive to help prevent delays.

This involves deploying almost 1,000 additional staff on long-distance trains and at stations.

This will include 750 additional staff on trains, 130 on particularly crowded platforms, and 100 assistants who will help passengers get on and off the train and find their seats.

They will join around 8,000 existing employees in DB’s long-distance division.

In addition, the company plans to invest around €10 billion in expanding its fleet and adding more seating by 2029. As a first step this year, the ICE fleet will grow to 360 trains, adding around 13,000 more seats for passengers. 

Though long-distance passenger numbers are still slightly below their record of 151 million in 2019, Peterson said DB was experiencing a “historic run on the railways” this year. 

READ ALSO: ‘We’re running late on this’: Deutsche Bahn promises better Wifi on German trains by 2026

Crowds gather on the platform at Cologne central station

Crowds gather on the platform at Cologne central station. Photo: picture alliance/dpa | Thomas Banneyer

Transport performance, i.e. the number of kilometres travelled, reached a record high between May and July, according to the rail operator. “People are travelling further distances by rail than they did before the pandemic,” the company explained.

When it comes to the larger problems faced by German railways, such as the need to upgrade large stretches of the network, improvements could take years.

Speaking to Welt, Peterson said that the current changes were more than just a token gesture. 

“These are not decisions taken out of desperation, but measures that will help in a concrete way,” he stated.

However, the DB board member admitted that there was still a “long way to go” in solving the rail networks’ wider problems.

READ ALSO: How the Greens want to replace Germany’s €9 ticket deal

Member comments

  1. Maybe they could staff the restaurants on board, so at least we can have a drink while suffering through this mess.

Log in here to leave a comment.
Become a Member to leave a comment.

EES PASSPORT CHECKS

EES border checks could undergo ‘soft launch’, UK says as app concerns mount

The UK government is preparing for a "soft launch" of the new EU border system – the Entry/Exit (EES) system - in October but authorities are still waiting for European Commission to confirm the start date, amid concerns over the delay of a new app.

EES border checks could undergo 'soft launch', UK says as app concerns mount

The UK government is preparing for a soft launch of the new EU border system – the entry/exit (EES) system – on the assumption that it will go live on October 6th, ministers told a hearing at the House of Commons European scrutiny committee this week.

But the European Commission is expected to confirm the exact launch date of the new biometric checks for non-EU travellers entering the Schengen area at some point this summer, they added.

“We are very much working on a basis whereby this policy will go live on the 6th of October. It is important that we plan for that eventuality. We are expecting to hear definitively from the European Union that ‘go live’ arrangement in the summer,” Tom Pursglove, UK Minister for Legal Migration and the Border told the committee.

The parliamentary committee is conducting an inquiry on the disruptions the system will cause in the UK.

Pursglove also said that “precautionary measures” have been agreed by the EU, that will be put in place in certain circumstances after the start of EES, for example if delays at the borders exceeded a certain length of time.

Guy Opperman, Under-Secretary of State at the Department for Transport, said that in practice this meant a “soft launch” of EES for 6 months before “a full go live”. During that soft launch EU member states and the UK could deploy flexibility measures should problems occur.

“The likelihood is, after multiple delays, that the 6th of October will proceed” and the implementation looks “very different” compared to previous scenarios considering the flexibility allowed in the first 6 months, he argued.

No details were given on what these “flexible” measures would involve however. 

READ ALSO: Your questions answered about Europe’s EES passport checks

He conceded that “a lot of work” still needs to be done but the UK “should be as ready as everybody” and “better be at front of the queue”.

App not ready

During the meeting, it also emerged that a much-anticipated app that would allow remote pre-registration of non-EU citizens subject to the checks will not be available for testing until August “at best”, prompting concerns about the EES launch date.

“You don’t need to be a sceptic about future projects to think that the provision of the app in August for going live in October is optimistic,” Opperman said.

Ministers confirmed that the app will not be ready in time for October and the committee previously stated it might be delayed until summer 2025.

The app will facilitate pre-registration, but photo and fingerprints will still have to be taken at the border in front of a guard, the committee heard.

READ ALSO: How do the EU’s new EES passport checks affect the 90-day rule?

Several MPs asked whether the entry into operation of the EES should be delayed again if technology is not ready. But Under-Secretary Opperman said the app “is not going to be a panacea to fix all problems”.

The main aim of EES is to increase security and to ensure that non-EU nationals visiting the Schengen area for a short-term do not stay more than 90 days in any 180-day period.

The entry into operation of the system has already been delayed several times and there have been calls from certain travel companies and national authorities to delay it again.

Under the new scheme, non-EU/EFTA travellers who do not need a visa will have to register their biometric data (finger prints and facial images) in a database that will also record each time they enter and exit the Schengen area.

Instead of having passports manually stamped, travellers will have to scan them at self-service kiosks before crossing the border. However, fingerprints and a photo will have to be registered in front of a guard at the first crossing and there are concerns the extra time needed will generate long queues, especially in Dover, Folkestone and St. Pancras station in London, where there are juxtaposed French and UK border checks.

Progress in preparations

Minister Pursglove also updated MPs on ongoing preparations. He said some testing of the system will take place within days, 5 kiosks have been installed at St. Pancras station and are available for testing. “You are beginning to see the physical infrastructure appear,” he said.

Kiosks and extra lanes are also being created at the port Dover and it was agreed with the EU passengers travelling by coach will be checked away from the Eastern dock, where controls usually take place, allowing to gain space. The vehicles will then sealed and drive on the ferries.

MPs also discussed the infrastructure cost linked to the introduction of the EES. Opperman said all EU countries will have to make “huge investments” in their ports. In the UK, he argued, this will help “address problems that have existed for some time”. Because of this “massive investment”, in a few years time “Dover will be totally transformed,” he said.

This article is published in cooperation with Europe Street News.

SHOW COMMENTS