SHARE
COPY LINK

CARS

Iconic Nürburgring track heads into final lap

The company that manages Germany's troubled Nürburgring circuit has petitioned to enter administration at a court in the town of Bad Neuenahr-Ahrweiler, it emerged on Saturday.

Iconic Nürburgring track heads into final lap
Photo: DPA

The interior minister of the state of Rhineland-Palatinate, the majority shareholder in the company that manages the legendary circuit, told news agency AFP that Nürburgring Automotive made the move on Friday evening.

A spokesman for the minister added that administrators will be appointed by the court on Monday. Nürburgring Automotive are €13 million in debt and had been counting on financial aid from the European Union after extensive renovation work.

But the EU told them last week that no decision on a bail-out would be made until at least July 30.

The Nürburgring has been the main venue for the German Grand Prix since World War II but has shared duties with Hockenheim since 2009.

The latter circuit, in the Eifel region of Baden-Württemberg in southwestern Germany, is hosting this weekend’s race and is also scheduled to stage the German Grand Prix in 2014, 2016 and 2018.

But fears are growing over the future of Formula 1 at the Nürburgring. F1 boss Bernie Ecclestone told the Rhein-Zeitung newspaper on Saturday that he hoped for a quick decision over whether the track will host next year’s racing event.

“The negotiations have to be completed within the next few weeks if there’s going to be a race in the Eifel in 2013,” said Ecclestone.

AFP/The Local/jlb

Member comments

Log in here to leave a comment.
Become a Member to leave a comment.

CARS

From lizards to water, eco-bumps snag Tesla’s giant Berlin car factory

In the green forest outside Berlin, a David and Goliath-style battle is playing out between electric carmaker Tesla and environmental campaigners who want to stop its planned "gigafactory".

From lizards to water, eco-bumps snag Tesla's giant Berlin car factory
Tesla's gigafactory outside the doors of Berlin. dpa-Zentralbild | Patrick Pleul

“When I saw on TV that the Tesla factory was going to be built here, I couldn’t believe it,” said Steffen Schorch, driving his trusty German-made car.

The 60-year-old from Erkner village in the Berlin commuter belt has become one of the faces of the fight against the US auto giant’s first European factory, due to open in the Brandenburg region near Berlin in July.

“Tesla needs far too much water, and the region does not have this water,” said the environmental activist, a local representative of the Nabu ecologist campaign group.

Announced in November 2019, Tesla’s gigafactory project was warmly welcomed as an endorsement of the “Made in Germany” quality mark – but was immediately met with opposition from local residents.

Demonstrations, legal action, open letters – residents have done everything in their power to delay the project, supported by powerful
environmental campaign groups Nabu and Gruene Liga.

Tesla was forced to temporarily suspend forest clearing last year after campaigners won an injunction over threats to the habitats of resident lizards and snakes during their winter slumber.

READ MORE: Is Germany’s Volkswagen becoming ‘the new Tesla’ as it ramps up e-vehicle production?

And now they have focused their attention on water consumption – which could reach up to 3.6 million cubic metres a year, or around 30 percent of the region’s available supply, according to the ZDF public broadcaster.

The extra demand could place a huge burden on a region already affected by water shortages and hit by summer droughts for the past three years.

Local residents and environmentalists are also concerned about the impact on the wetlands, an important source of biodiversity in the region.

Tesla Street

“The water situation is bad, and will get worse,” Heiko Baschin, a spokesman for the neighbourhood association IG Freienbrink, told AFP.

Brandenburg’s environment minister Axel Vogel sought to play down the issue, saying in March that “capacity has not been exceeded for now”.

But the authorities admit that “the impact of droughts is significant” and have set up a working group to examine the issue in the long term.

The gigafactory is set to sprawl over 300 hectares – equivalent to approximately 560 football fields – southwest of the German capital.

Tesla is aiming to produce 500,000 electric vehicles a year at the plant, which will also be home to “the largest battery factory in the world”,
according to group boss Elon Musk.

In a little over a year and a half, swathes of coniferous forest have already been cleared to make way for vast concrete rectangles on a red earth base, accessed via the already iconic Tesla Strasse (Tesla Street).

German bureaucracy

The new site still has only provisional construction permits, but Tesla has been authorised by local officials to begin work at its own risk.

Final approval depends on an assessment of the project’s environmental impact – including the issue of water.

In theory, if approval is not granted, Tesla will have to dismantle the entire complex at its own expense.

But “pressure is being exerted (on the regulatory authorities), linked to Tesla’s significant investment”, Gruene Liga’s Michael Greschow told AFP.

In early April, Tesla said it was “irritated” by the slow pace of German bureaucracy, calling for exceptions to the rules for projects that help the environment.

Economy Minister Peter Altmaier agreed in April that his government “had not done enough” to reduce bureaucracy, lauding the gigafactory as a “very important project”.

Despite Germany’s reputation for efficiency, major infrastructure projects are often held up by bureaucracy criticised as excessive by the business community.

Among the most embarrassing examples are Berlin’s new airport which opened last October after an eight-year delay and Stuttgart’s new train station, which has been under construction since 2010.

Brandenburg’s economy minister, Joerg Steinbach, raised the possibility in February that the Tesla factory could be delayed beyond its July planned opening for the same reason.

SEE ALSO: Tesla advertises over 300 jobs for new Gigafactory near Berlin

SHOW COMMENTS