SHARE
COPY LINK

OIL

Svanberg defends BP over Gulf oil spill

BP has emerged as a safer company from last year's massive Gulf of Mexico oil spill, chairman Carl-Henric Svanberg insisted Tuesday, defending the British company's widely-criticised handling of the crisis.

Svanberg defends BP over Gulf oil spill

Svanberg had been BP’s chairman for only a few months when a massive explosion on April 20, 2010 rocked the Gulf of Mexico Deepwater Horizon rig leased by the British energy giant.

The blast killed 11 people and sent some 4.9 million barrels of oil gushing into the Gulf over a three-month period, wreaking havoc on the region’s environment and economy.

A year after the blast, Svanberg told media in his native Sweden BP had learned its lessons and taken steps to become a safer company.

“But we weren’t unsafe before either — 50,000 holes had been drilled in the Gulf of Mexico before it happened,” he insisted in an interview with business daily Dagens Industri (DI).

“The whole industry has learned from the accident and we are doing everything to ensure that it doesn’t happen again.”

Svanberg was criticised for his low profile in the crucial weeks after the spill — Britain’s Independent newspaper called him “the invisible man” while a Swedish daily referred to his “ostrich tactics.”

He said in two interviews published Tuesday that at the time he had deemed it was chief executive Tony Hayward’s role to step forward and explain the company’s position.

In the end though, “the problem wasn’t that I was out too little, the problem was most probably that Tony was out too much. He became over exposed,” he told the Svenska Dagbladet daily (SvD).

“We on the board did not take the initiative until we realised that the last attempt to plug (the ruptured oil well) at the end of May would fail, when it became clear that the accident would hurt us economically and politically,” he told DI.

Svanberg was then thrust into the limelight when he was summoned to a meeting with US President Obama at the beginning of June.

He insisted to SvD he had not been “called in,” stressing BP had fought to obtain the meeting, which he called a “turning point.”

But it was also the stage of one of Svanberg’s major hostages to fortune — on the White House lawn on June 10th, he said BP “cared about the small people.”

“That became a much bigger deal in Sweden than in England or the United States. It is clear that was unfortunate,” he said.

Svanberg still has the support of BP shareholders, 92 percent of whom voted to re-elect the Swede to serve as the company’s chair for another year, the BBC reported on Monday.

Member comments

Log in here to leave a comment.
Become a Member to leave a comment.

BUSINESS

France’s EDF hails €10billion profit, despite huge UK nuclear charge

French energy giant EDF has unveiled net profit of €10billion and cut its massive debt by increasing nuclear production after problems forced some plants offline.

France's EDF hails €10billion profit, despite huge UK nuclear charge

EDF hailed an “exceptional” year after its loss of €17.9billion in 2022.

Sales slipped 2.6 percent to €139.7billion , but the group managed to slice debt by €10billion euros to €54.4billion.

EDF said however that it had booked a €12.9 billion depreciation linked to difficulties at its Hinkley Point nuclear plant in Britain.

The charge includes €11.2 billion for Hinkley Point assets and €1.7billion at its British subsidiary, EDF Energy, the group explained.

EDF announced last month a fresh delay and additional costs for the giant project hit by repeated cost overruns.

“The year was marked by many events, in particular by the recovery of production and the company’s mobilisation around production recovery,” CEO Luc Remont told reporters.

EDF put its strong showing down to a strong operational performance, notably a significant increase in nuclear generation in France at a time of historically high prices.

That followed a drop in nuclear output in France in 2022. The group had to deal with stress corrosion problems at some reactors while also facing government orders to limit price rises.

The French reactors last year produced around 320.4 TWh, in the upper range of expectations.

Nuclear production had slid back in 2022 to 279 TWh, its lowest level in three decades, because of the corrosion problems and maintenance changes after
the Covid-19 pandemic.

Hinkley Point C is one of a small number of European Pressurised Reactors (EPRs) worldwide, an EDF-led design that has been plagued by cost overruns
running into billions of euros and years of construction delays.

SHOW COMMENTS